×

Update on the I-40 Bridge Over the Mississippi River

By Ronni Chase May 15, 2021 | 8:23 AM

(tn.gov/Peg Broadcasting News)

The I-40 Bridge over the Mississippi River could remain closed for up to two months for temporary repairs.  On Tuesday, inspection crews discovered a structural crack and shut down the Hernando de Soto Bridge, which is a major traffic crossing between Memphis and Arkansas.  Mississippi River traffic below the bridge has been allowed to resume with some restrictions.  Officials say the interim repair would allow time for a new bridge component to be fabricated to replace the bridge’s damaged 37’ long section.